Wednesday, September 1, 2010

Post #7: "Order has been placed."

The farm, air pump, and tubing are on their way. =D

All that's left are the ants. As soon as the other $15 posts in my account, I'll order those too. The only downside is that the shipment will be here between the 7th or 13th. I'd have paid the extra for expedited shipping, but the Farm would have still shipped on the 7th.

So by this time next week, there is a very good chance I will have at least ONE of the items for the project in my hands. From there on, it's a matter of taking the time to do this project the right way, and not cut corners to make things work.

OUR VISION MUST BE PRESERVED.

2 comments:

  1. I CAN'T WAIT.
    MAKE IT SHIP FASTER.

    ReplyDelete
  2. I WISH I COULD.

    Seriously; I've built very few things in my life, aside from PC's. This is the first unique creation I'm making. I have never been this excited to CREATE something. It's a really awesome feeling.

    ReplyDelete